Design Registration

No fee increases until program consultation. We propose no increases and no changes to design registration at this time.

We recognize that we were unable to meet service demands this year and that our service delays impacted applicants and their customers. In the coming years, we plan to consult with boiler, gas, and elevating devices clients on how to change our design registration program to better meet their needs. We will also consult on how to structure our fees to align with any program changes.

Removed: Electrical product approval fee. We no longer offer this service, except for silver labels for manufactured homes and factory-built structures. The silver label fee is listed as “Electrical approval for a used manufactured home, used factory-built structure or a used recreational vehicle (SILVER LABEL)”.

Removed: Boiler design compliance consultation rate. We no longer offer this service.

Clarified: Gas design registration. We are changing the term “design approval” to “design registration” to clarify the difference between gas design registration and gas product approvals. This wording will be adjusted in the gas fee schedule.

Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>